No caption
IMG_2725.JPG
Details
Thursday, January 29, 2026 · 10:54 AM
39.39497, -120.02137· 1652m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4587sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.8535
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0.0039
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2026:01:29
GPSDestBearing331.9954
GPSDestBearingRefTrue North
GPSHPositioningError13.8307
GPSImgDirection331.9954
GPSImgDirectionRefT
GPSSpeed0.3072
GPSSpeedRefK
GPSTimeStamp18:54:29
HostComputeriPhone 16 Pro
latitude39.3950
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2026-01-29T10:54:31.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.1634
Software26.2.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized009
SubSecTimeOriginal009
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
In the foreground, there is a partially paved path with soil and gravel piles on the side. There is a wooden fence parallel to the path, with trees and a structure beyond the fence. The path appears to have been recently cleared or prepared for further work. The environment suggests work related to erosion control or surface stabilization.
swppp-erosion-control
partially paved with gravel and soil clear weather with daylight access appears clear with space beside path
Safety features are not visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
6m
trenching
trenchingexcavation
skid-steer
7m
other
roofingplywood-installation
plywood
8m
trenching
trenchingexcavation
dump truck
8m
swppp erosion control
erosion-controlsite-preparation
dirt
12m
trenching
pipeline-inspectiontrenching
hand tool
14m
other
site-accessdirt-path
14m
trenching
trenchingpipe-handling
measuring tool
15m
excavation
pothole-measurementutility-locating
backhoe-loader
16m
trenching
utility-locatingtrench-measuring
excavator
17m
trenching
trenchingexcavation
hand tool