IMG_0005.JPG

No caption

IMG_0005.JPG

Tags

Details

Monday, September 8, 2025 · 12:23 PM

39.39471, -120.02229· 1638m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3704sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.8686
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:09:08
GPSDestBearing292.4991
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection292.4991
GPSImgDirectionRefT
GPSSpeed0.0700
GPSSpeedRefK
GPSTimeStamp19:23:20
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0223
MeteringModePattern
ModifyDate2025-09-08T12:23:21.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.8548
Software18.6.2
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized052
SubSecTimeOriginal052
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows an open trench with blue pipes and a pipe elbow joint visibly connected. The trench is in a rocky soil area with exposed vertical dirt sides. A black pipe elbow is joined to two straight sections of blue pipe by flanged bolts. A hand tool is partially visible, resting on the ground near the trench.

pipeline-installation
rocky soil with open trench sunny with natural lighting no congestion visible
Safety controls and PPE are not visible in frame.

Analyzed Apr 21, 2026