No caption
IMG_9913.JPG
Details
Thursday, September 4, 2025 · 9:19 AM
39.39469, -120.02261· 1638m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/465sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.9698
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:04
GPSDestBearing70.9939
GPSDestBearingRefTrue North
GPSHPositioningError14.3341
GPSImgDirection70.9939
GPSImgDirectionRefT
GPSSpeed0.6582
GPSSpeedRefK
GPSTimeStamp16:19:11
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-09-04T09:19:13.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.8601
Software18.6.2
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized148
SubSecTimeOriginal148
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a trench that has been excavated along a road with pipelines laid within it. An excavator is present at the far end of the trench. Several traffic cones are positioned near the trench for safety. The road surface is cracked and uneven near the trench edges.
trenching
cracked road surface with trench sunny with clear lighting road access with multiple cones for safety
Cones are used for marking the trench area.
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingpipe-placement
excavator
1m
trenching
trenchingexcavation
excavator
2m
backfill
trench-backfillingmanual-soil-work
excavator
2m
trenching
trenchingpipe-laying-preparation
skid-steer loader
2m
pipeline installation
pipeline-installationvalve-installation
pipes
2m
trenching
trenchingroadway-excavation
shovel
2m
excavation
boulder-removalexcavation-activity
excavator
2m
excavation
utility-potholingdepth-measurement
measuring-tape
3m
trenching
soil-compactiontrenching
compactor
3m
trenching
trenchingexcavation-work
excavator