No caption
IMG_9878.JPG
Details
Tuesday, September 2, 2025 · 10:00 AM
39.39469, -120.02261· 1641m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/248sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.0558
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:02
GPSDestBearing162.6089
GPSDestBearingRefTrue North
GPSHPositioningError5.2482
GPSImgDirection162.6089
GPSImgDirectionRefT
GPSSpeed0.5432
GPSSpeedRefK
GPSTimeStamp17:0:27
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-09-02T10:00:27.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.9546
Software18.6.2
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized548
SubSecTimeOriginal548
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers wearing hi-vis vests are inside an open trench, likely working on pipeline installation. An excavator is positioned near the trench with a bucket, and safety cones are placed around the trench. The surface is a mix of pavement and exposed soil. A building is visible in the background.
trenching
mixed pavement and soil overcast daylight open access with adjacent building
Safety cones are visibly placed around the open trench; workers are wearing PPE.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipeline-laying
excavator
1m
trenching
trenchingpipe-placement
excavator
1m
backfill
trench-backfillingmanual-soil-work
excavator
2m
trenching
trenchingroadway-excavation
shovel
2m
excavation
boulder-removalexcavation-activity
excavator
2m
pipeline installation
pipeline-installationvalve-installation
pipes
2m
trenching
trenchingpipe-laying-preparation
skid-steer loader
3m
excavation
utility-potholingdepth-measurement
measuring-tape
3m
trenching
soil-compactiontrenching
compactor
3m
pipeline installation
pipe-installationtrenching
excavator