No caption
IMG_9865.JPG
Details
Friday, August 29, 2025 · 3:09 PM
39.39259, -120.02260· 1627m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1437sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.0647
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:29
GPSDestBearing157.4584
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection157.4584
GPSImgDirectionRefT
GPSSpeed1.2354
GPSSpeedRefK
GPSTimeStamp22:9:0
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-08-29T15:09:00.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.4886
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized694
SubSecTimeOriginal694
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavated trench running parallel to a dirt road with a line of pipes laid alongside. The area is surrounded by containers and other construction materials. The trench appears to be freshly dug with clear track marks visible in the soil. There are signs of staging and material storage on the side.
trenching
exposed soil with visible track marks daytime, overcast clear laydown area with multiple stored items
No visible safety features in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
site grading
site-preparationmarker-placement
soil
0m
site grading
site-gradingpathway-preparation
excavator
1m
excavation
excavationearthwork
excavator
1m
swppp erosion control
erosion-controlgrading
backhoe
1m
survey layout
survey-layoutsurveying-equipment
surveying-instrument
1m
site grading
site-gradingrocks
excavator
2m
excavation
excavationrocks
excavator
2m
site grading
gradingsite-grading
compactor
2m
concrete work
concrete-pouringtrench-filling
cement truck
3m
site grading
road-gradingcompaction
soil-compactor