No caption
IMG_2788.JPG
Details
Friday, January 30, 2026 · 3:11 PM
39.39259, -120.02258· 1634m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1770sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.2582
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing253.4470
GPSDestBearingRefTrue North
GPSHPositioningError5.7239
GPSImgDirection253.4470
GPSImgDirectionRefT
GPSSpeed0.2234
GPSSpeedRefK
GPSTimeStamp23:11:46
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2026-01-30T15:11:46.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.7895
Software26.2.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized935
SubSecTimeOriginal935
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a job site with a backhoe and two construction workers near a dirt mound. The workers are on uneven ground, with rocky surfaces visible in the foreground. The background includes industrial grading and potential erosion control measures. The equipment and personnel suggest erosion control activities but the precise phase is unclear.
swppp-erosion-control
uneven dirt and rocky surface clear with sunlight open with no visible obstructions
Safety gear such as hi-vis vests is visible on workers.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
site grading
site-gradingpathway-preparation
excavator
1m
excavation
excavationearthwork
excavator
1m
site grading
site-preparationmarker-placement
soil
1m
trenching
trenchingexcavation
pipes
2m
survey layout
survey-layoutsurveying-equipment
surveying-instrument
2m
site grading
road-gradingcompaction
soil-compactor
3m
site grading
site-gradingrocks
excavator
3m
excavation
excavationrocks
excavator
3m
site grading
soil-preparationmaterial-handling
skid steer loader
3m
site grading
gradingsite-grading
compactor