No caption
IMG_9577.JPG
Details
Wednesday, August 20, 2025 · 1:48 PM
39.39424, -120.02278· 1590m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/8130sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.7527
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:20
GPSDestBearing3.1289
GPSDestBearingRefTrue North
GPSHPositioningError21.9671
GPSImgDirection3.1289
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:48:11
HostComputeriPhone 16 Pro
latitude39.3942
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0228
MeteringModePattern
ModifyDate2025-08-20T13:48:11.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.9891
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized955
SubSecTimeOriginal955
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows trenching activities with two blue pipes laid in a trench. There are various tools scattered around the trench, and a safety cone is positioned near the edge. The ground surface is rocky and uneven, indicating excavation work. A vehicle tire is visible near the trench, indicating proximity to a road or access way.
trenching
rocky soil surface around trench bright lighting likely due to sunny conditions limited space near trench; vehicle access visible
Safety cone is visible, but other PPE is not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
soil-compactiontrenching-activity
tracked excavator
3m
trenching
trenchingexcavation
excavator
3m
trenching
trenchingexcavation-activity
excavator
4m
trenching
trenchingconduit-installation
excavator
5m
pipeline installation
pipe-connectionvalve-installation
soil
6m
site grading
compactionroad-surface-preparation
roller-compactor
6m
trenching
trenchingmanual-excavation
power tool
8m
excavation
excavationdigging
excavator
8m
pipeline installation
pipeline-installationblue-pipe
blue-pipe
8m
other
delivery-movementdelivery-truck
delivery-truck