No caption
IMG_8797.JPG
Details
Monday, July 14, 2025 · 12:25 PM
39.39423, -120.02281· 1636m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2110sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.6591
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:14
GPSDestBearing354.1435
GPSDestBearingRefTrue North
GPSHPositioningError32.2932
GPSImgDirection354.1435
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp19:25:20
HostComputeriPhone 16 Pro
latitude39.3942
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0228
MeteringModePattern
ModifyDate2025-07-14T12:25:21.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.0428
Software18.6
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized543
SubSecTimeOriginal543
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A trench runs parallel to a road with soil piles on one side, indicating active trenching work. An excavator and construction cones are visible along the road, suggesting ongoing excavation work. Two tools are placed within the trench area, and a damaged fence is visible adjacent to the trench. The work appears to be part of a duct bank installation project.
trenching
soil along trench, paved road clear daylight partially obstructed by trench and equipment
Safety cones are visible, but no trench boxes or barriers observed.
Analyzed Apr 21, 2026
Nearby Photos
3m
trenching
trenchingpipeline-placement
visible truck tire
5m
trenching
soil-compactiontrenching-activity
tracked excavator
5m
pipeline installation
pipe-connectionvalve-installation
soil
6m
trenching
trenchingexcavation-activity
excavator
6m
trenching
trenchingroad-work
excavator
7m
trenching
trenchingmanual-excavation
power tool
7m
trenching
trenchingconduit-installation
excavator
8m
pipeline installation
pipe-installationmechanical-setup
soil
9m
site grading
compactionroad-surface-preparation
roller-compactor
9m
trenching
trenchingroadside-trenching
excavator