IMG_8843.JPG

No caption

IMG_8843.JPG

Tags

Details

Wednesday, July 16, 2025 · 11:49 AM

39.39288, -120.02261· 1637m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4673sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.9004
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:07:16
GPSDestBearing351.7065
GPSDestBearingRefTrue North
GPSHPositioningError14.7075
GPSImgDirection351.7065
GPSImgDirectionRefT
GPSSpeed0.3993
GPSSpeedRefK
GPSTimeStamp18:49:52
HostComputeriPhone 16 Pro
latitude39.3929
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-07-16T11:49:52.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.1901
Software18.6
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized558
SubSecTimeOriginal558
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows two blue pipes laid within an open trench in a construction area. A tracked loader and an excavator are visible near the trench's edge. The trench is cut into dry, rocky soil. The activity appears to involve laying pipes into the trench.

pipeline-installation
dry rocky soil with open trench sunny with clear lighting adequate space around trench for equipment
Safety features are not visible in frame

Analyzed Apr 21, 2026