No caption
IMG_7127.JPG
Details
Friday, April 11, 2025 · 9:35 AM
39.39163, -120.02145· 1666m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/252sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.3257
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:11
GPSDestBearing154.5215
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection154.5215
GPSImgDirectionRefT
GPSSpeed1.4686
GPSSpeedRefK
GPSTimeStamp16:35:18
HostComputeriPhone 16 Pro
latitude39.3916
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-04-11T09:35:20.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.9774
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized279
SubSecTimeOriginal279
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An open area of disturbed earth is visible on a slope, indicating excavation activity. A tracked excavator is positioned at the top of the slope, suggesting recent or ongoing earthmoving work. The site features rocks, vegetation, and exposed soil. The weather appears clear and sunny.
excavation
rocky and earthy slope clear and sunny open access on top of slope
No specific safety controls are visible in frame; uneven ground is present.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
trenching
trenchingexcavating
excavator
4m
pipeline installation
pipe-installationtrenching
blue-pipes
5m
site grading
site-gradingground-preparation
gravel
6m
valve vault
valve-installationpipe-assembly
hand tools
7m
trenching
trenchingcaution-tape
earth
7m
trenching
trenchingexcavation
7m
site grading
site-gradingdirt-surface
7m
trenching
trenchingexcavation
8m
swppp erosion control
erosion-controlswppp-compliance
erosion-control-wattles
8m
electrical
access-controlutility-access
access cover