No caption
IMG_0954.JPG
Details
39.39164, -120.02151· 1685m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Show all EXIF (43 fields)
AI Analysis
The image shows a valve assembly setup with multiple red valves connected to blue pipes in an excavation area. This assembly is located next to a large concrete vault, which is partially buried in the ground. Additional tools and components are seen around the installation site, and the surrounding area has exposed soil and construction equipment. The work appears to involve connecting piping systems to the vault.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
site grading
2m
trenching
3m
site grading
4m
trenching
4m
electrical
4m
trenching
4m
pipeline installation
4m
trenching
5m
other
5m
trenching