No caption
IMG_7506.JPG
Details
Thursday, May 1, 2025 · 1:59 PM
39.39182, -120.02182· 1667m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/985sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7099
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:01
GPSDestBearing167.4944
GPSDestBearingRefTrue North
GPSHPositioningError19.1295
GPSImgDirection167.4944
GPSImgDirectionRefT
GPSSpeed1.1971
GPSSpeedRefK
GPSTimeStamp20:59:47
HostComputeriPhone 16 Pro
latitude39.3918
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0218
MeteringModePattern
ModifyDate2025-05-01T13:59:48.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9443
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized406
SubSecTimeOriginal406
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An excavator is positioned on a slope, engaged in trenching work. There are two people visible, with one inspecting or assisting next to the trench. Piping is laid within the trench while the sides appear to be freshly dug with loose earth. Vegetation and trees surround the area, indicating a natural setting.
trenching
slope with loose soil clear and sunny limited access on slope
PPE is visible on workers, but no additional safety controls are in frame.
Analyzed Apr 21, 2026
Nearby Photos
7m
trenching
trenchingexcavation
excavator
7m
trenching
trenchingexcavation
excavator
7m
site grading
site-gradingland-clearing
tracked-excavator
8m
site grading
gradingsite-preparation
soil
8m
trenching
trenchingpipe-repair
broken blue pipes
9m
trenching
trenchingutility-installation
soil
9m
site grading
site-preparationsoil-grading
9m
site grading
earthmovingsite-development
wheel-loader
10m
swppp erosion control
site-preparationequipment-staging
excavator
10m
excavation
earthmovingexcavation
excavator