No caption
IMG_7624.JPG
Details
Monday, May 5, 2025 · 3:17 PM
39.39186, -120.02190· 1655m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/651sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.3753
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:05:05
GPSDestBearing269.4254
GPSDestBearingRefTrue North
GPSHPositioningError13.9665
GPSImgDirection269.4254
GPSImgDirectionRefT
GPSSpeed2.4457
GPSSpeedRefK
GPSTimeStamp22:17:14
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2025-05-05T15:17:15.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.3466
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized038
SubSecTimeOriginal038
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a dirt path on a slope with evident grading or preparation work. There is loose soil and some tracks on the ground, suggesting recent activity. Trees are visible on the left and right sides, providing a natural backdrop. The landscape extends into a valley with infrastructure in the distance.
site-grading
loose soil on slope clear daylight with shadows open access along slope
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
site grading
earthmovingsite-development
wheel-loader
2m
site grading
site-gradingland-clearing
tracked-excavator
2m
trenching
trenchingpipe-installation
dirt
2m
trenching
trenchingexcavation
excavator
3m
excavation
excavationmaterial-movement
excavator
3m
excavation
earthmovingexcavation
excavator
3m
excavation
excavationearthmoving
excavator
3m
trenching
gradingconduit-placement
soil
3m
swppp erosion control
site-preparationequipment-staging
excavator
4m
trenching
trenchingearthwork
excavators