No caption
IMG_2766.JPG
Details
Friday, January 30, 2026 · 12:06 PM
39.39184, -120.02193· 1653m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3891sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.4166
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2026:01:30
GPSDestBearing310.8048
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection310.8048
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:6:45
HostComputeriPhone 16 Pro
latitude39.3918
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0219
MeteringModePattern
ModifyDate2026-01-30T12:06:46.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software26.2.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized940
SubSecTimeOriginal940
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site with a clear area for site preparation. Excavators and other heavy machinery are present near the center. Shipping containers are located at the right side of the image, with dirt piles in the open area. A railroad track runs through the site, and a highway is visible in the background.
swppp-erosion-control
soil and dirt near tracks clear weather with daylight open access with clear spaces for staging equipment
Safety features are not visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
earthmovingexcavation
excavator
1m
swppp erosion control
silt-fence-installationsilt-fence
silt-fence
1m
swppp erosion control
erosion-controlswppp
excavator
2m
excavation
excavationearthmoving
excavator
2m
site grading
earthmovingsite-development
wheel-loader
2m
site grading
site-gradingland-clearing
tracked-excavator
3m
swppp erosion control
silt-fence-installationerosion-control
silt-fence
3m
trenching
trenchingexcavation
excavator
3m
excavation
excavationmaterial-movement
excavator
3m
site grading
gradingsite-preparation
soil