No caption
IMG_7777.JPG
Details
Wednesday, May 14, 2025 · 10:33 AM
39.39132, -120.02107· 1689m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2053sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue8.7511
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:14
GPSDestBearing315.8618
GPSDestBearingRefTrue North
GPSHPositioningError6.1083
GPSImgDirection315.8618
GPSImgDirectionRefT
GPSSpeed0.1699
GPSSpeedRefK
GPSTimeStamp17:33:57
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-05-14T10:33:58.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.0038
Software18.5
SubjectArea{"0":2859,"1":2137,"2":3145,"3":1886}
SubSecTimeDigitized027
SubSecTimeOriginal027
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a detailed view of a welded seam connecting two metal plates. There is visible rust around the weld area and welding marks along the seam. The letters 'W' appear to be written with chalk near the seam. The image focuses solely on this area, with no broader context of surroundings.
mechanical-installation
metal surface indoor lighting or overcast conditions not visible in frame
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
other
tree-removaltree
2m
site grading
site-gradingland-clearing
3m
site grading
site-gradingground-clearing
excavator
3m
site grading
site-gradingvegetation-clearing
bulldozer
4m
concrete work
concrete-pouringfoundation-work
concrete-truck
5m
swppp erosion control
stagingerosion-control
gravel
5m
mechanical installation
weldingmechanical-work
crane
5m
mechanical installation
weldingtank-welding
welding-torch
6m
rebar formwork
rebar-tyingformwork-installation
rebar
7m
site grading
foundation-preparationcompacting
excavator