No caption
IMG_6405.JPG
Details
Monday, March 3, 2025 · 4:41 PM
39.39131, -120.02105· 1681m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back dual wide camera 2.22mm f/2.2
2.220000028611935mmf/2.21/186sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (39 fields)
ApertureValue2.2750
BrightnessValue6.5513
ColorSpace1
CompositeImageGeneral Composite Image
ExifImageHeight2268
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:03
GPSDOP5.1283
GPSImgDirection227.4037
GPSImgDirectionRefT
GPSTimeStamp16:41:42
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 6.7650, 1.7800, 2.2000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-03-03T16:41:42.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.5358
Software18.4
SubjectArea{"0":2015,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized189
SubSecTimeOriginal189
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a cleared and uneven patch of ground with a large fallen tree in the foreground, indicating site preparation or grading activity. The area is surrounded by mountains and forest. The sky is clear with scattered clouds, suggesting good weather. There are no visible equipment or personnel actively working in the image.
site-grading
uneven ground with dirt and vegetation partly cloudy and fair lighting no congestion or laydown visible
No safety features are visible in the frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
other
tree-removaltree
2m
mechanical installation
weldingmetal-joining
metal plates
4m
site grading
site-gradingground-clearing
excavator
4m
site grading
site-gradingvegetation-clearing
bulldozer
5m
swppp erosion control
stagingerosion-control
gravel
6m
concrete work
concrete-pouringfoundation-work
concrete-truck
8m
rebar formwork
formwork-constructionwooden formwork
wood
8m
mechanical installation
weldingmechanical-work
crane
8m
mechanical installation
weldingtank-welding
welding-torch
8m
excavation
excavation-preparationsite-layout
plastic-liner