No caption
IMG_7118.JPG
Details
Friday, April 11, 2025 · 8:38 AM
39.39136, -120.02126· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/967sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.7501
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:11
GPSDestBearing91.2474
GPSDestBearingRefTrue North
GPSHPositioningError3.7080
GPSImgDirection91.2474
GPSImgDirectionRefT
GPSSpeed0.0461
GPSSpeedRefK
GPSTimeStamp15:38:34
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-04-11T08:38:34.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9175
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized434
SubSecTimeOriginal434
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a set of large anchor bolts and nuts staged on wooden planks in a construction area. Two large wrenches are also present on the ground in the foreground. In the background, formwork materials are being set up, suggesting preparation for a concrete pour. The ground is uneven and covered with gravel and dirt.
concrete-work
gravel and dirt clear weather materials are staged on uneven ground
Safety features are not visible in frame; however, the ground appears uneven.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
pipe-installationvalve-vault-work
shovel
1m
trenching
trenchingexcavation-activity
excavation-equipment
2m
rebar formwork
formwork-assemblywooden-bracing
timber
2m
pipeline installation
pipeline-installationvalve-adjustment
shovel
2m
concrete work
formwork-constructiontank-foundation-setup
utility-vehicle
2m
inspection documentation
tank-inspectionvault-access
concrete-vault
2m
site grading
gradingexcavation
excavator
2m
site grading
site-gradingsoil-compaction
excavator
2m
excavation
compactionexcavation
plate compactor
2m
excavation
compactingfoundation-preparation
compactor