No caption
IMG_0965.JPG
Details
Thursday, October 16, 2025 · 1:19 PM
39.39137, -120.02128· 1690m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6711sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue10.1135
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:16
GPSDestBearing346.0011
GPSDestBearingRefTrue North
GPSHPositioningError32.1164
GPSImgDirection346.0011
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:19:29
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-16T13:19:30.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.7124
Software26.0.1
SubjectArea{"0":2853,"1":2138,"2":3146,"3":1883}
SubSecTimeDigitized591
SubSecTimeOriginal591
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows two workers installing or adjusting pipelines within a trench. Visible components include blue pipes connected by red fittings leading into a concrete valve vault. The area appears to be in the rough terrain, with visible earthwork. Workers are wearing standard safety gear.
pipeline-installation
dirt trench sunny and clear open trench with nearby earthwork
Standard PPE visible; trench hazards present due to open excavation.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
inspection documentation
tank-inspectionvault-access
concrete-vault
1m
rebar formwork
formwork-assemblywooden-bracing
timber
2m
concrete work
anchor-bolt-stagingformwork-preparation
wrenches
2m
trenching
pipe-installationvalve-vault-work
shovel
2m
excavation
excavationsite-preparation
mini-excavator
2m
trenching
trenchingexcavation-activity
excavation-equipment
2m
pipeline installation
pipeline-installationpipe-joining
pipes
2m
valve vault
valve-vault-installationpipeline-connection
concrete
2m
rebar formwork
rebar-installationformwork-preparation
gravel
3m
trenching
trenchingconduit-placement
conduit