No caption
IMG_6525.JPG
Details
Tuesday, March 11, 2025 · 9:56 AM
39.39135, -120.02124· 1696m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/243sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue6.8377
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:11
GPSDestBearing68.6308
GPSDestBearingRefTrue North
GPSHPositioningError14
GPSImgDirection68.6308
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:56:49
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-03-11T09:56:49.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.9266
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized708
SubSecTimeOriginal708
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site with workers participating in site grading for a tank foundation. Two workers in high-visibility vests are compacting dirt with hand tools. An excavator is positioned nearby, indicating active earth-moving operations in progress.
site-grading
compacted soil clear and sunny open area with access for machinery
PPE is visible on workers but no additional safety controls are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
site grading
gradingexcavation
excavator
0m
excavation
compactingfoundation-preparation
compactor
0m
excavation
compactionexcavation
plate compactor
0m
valve vault
compactiontrench-compacting
compactor
1m
rebar formwork
formwork-setupfooting-preparation
wood
1m
concrete work
formwork-constructiontank-foundation-setup
utility-vehicle
1m
pipeline installation
pipe-installationwall-penetration
gravel
2m
rebar formwork
formwork-installationwooden formwork
construction truck
2m
concrete work
foundation-installationconcrete-foundation
red machinery
2m
trenching
trenchingexcavation-activity
excavation-equipment