No caption
IMG_7242.JPG
Details
Thursday, April 17, 2025 · 12:50 PM
39.39139, -120.02122· 1676m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1464sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.9325
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:17
GPSDestBearing37.4876
GPSDestBearingRefTrue North
GPSHPositioningError4.9644
GPSImgDirection37.4876
GPSImgDirectionRefT
GPSSpeed1.0509
GPSSpeedRefK
GPSTimeStamp19:50:18
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-17T12:50:19.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5158
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized284
SubSecTimeOriginal284
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a large circular structure covered with a black protective material, possibly as part of a tank foundation. Rebar stakes protrude from the top, indicating potential for concrete pour. Excavated soil surrounds the structure, and a piece of heavy equipment is seen off to the left, suggesting ongoing site work.
excavation
excavated soil and dirt clear sky and daylight open site with equipment access
No visible safety controls or PPE in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
other
site-workfinished-water-tank
gravel
1m
rebar formwork
rebar-assemblyformwork-installation
rebar
1m
excavation
excavationformwork-setup
leveling-tripod
1m
rebar formwork
formwork-installationfoundation-preparation
wooden-planks
1m
trenching
trenchingpipe-installation
gravel
1m
rebar formwork
formwork-constructiontank-foundation-preparation
wood
1m
mechanical installation
valve-installationmechanical-work
valve
1m
mechanical installation
valve-installationpipeline-connection
valve
1m
concrete work
concrete-pourformwork-setup
concrete
1m
site grading
slope-stabilizationsite-preparation
tracked excavator