No caption
IMG_0835.JPG
Details
Friday, October 10, 2025 · 8:14 AM
39.39140, -120.02122· 1677m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/104sISO 40
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.8493
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:10
GPSDestBearing89.7860
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection89.7860
GPSImgDirectionRefT
GPSSpeed0.5289
GPSSpeedRefK
GPSTimeStamp15:14:44
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-10T08:14:45.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6972
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized925
SubSecTimeOriginal925
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a valve assembly attached to a pipeline, which is connected to a tank. A worker in a high-visibility jacket and hard hat is sitting nearby, apparently engaging with the equipment. The area is outdoors with trees and a gravel surface visible in the background.
mechanical-installation
gravel daylight and clear open area with no visible congestion
Worker is wearing PPE while inspecting or working near the valve, with a fence visible.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
mechanical installation
valve-installationmechanical-work
valve
0m
rebar formwork
formwork-installationfoundation-preparation
wooden-planks
1m
trenching
trenchingpipe-installation
gravel
1m
excavation
excavationformwork-setup
leveling-tripod
1m
pipeline installation
pipe-installationtrenching
concrete
1m
rebar formwork
formwork-constructionwall-preparation
wood
1m
excavation
tank-foundation-preparationexcavation-work
excavator
1m
rebar formwork
rebar-assemblyformwork-installation
rebar
1m
other
site-workfinished-water-tank
gravel
1m
pipeline installation
pipeline-installationvalve-installation
hand-tools