No caption
IMG_6960.JPG
Details
Friday, April 4, 2025 · 9:13 AM
39.39134, -120.02121· 1678m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/321sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.4470
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:04
GPSDestBearing61.2236
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection61.2236
GPSImgDirectionRefT
GPSSpeed0.0684
GPSSpeedRefK
GPSTimeStamp16:13:45
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-04T09:13:45.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.3266
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized931
SubSecTimeOriginal931
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a circular wooden formwork structure with numerous supporting wooden braces radiating outward. The center of the formwork is covered with black plastic sheeting. The surrounding area has patches of snow, and there are trees and hills in the background. The image lacks visible heavy equipment or vehicles.
rebar-formwork
soil with snow patches clear weather, daylight open area with visible formwork and braces
No visible safety features or PPE are present in the frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
pipeline installation
pipeline-installationtrenching
gravel
1m
concrete work
concrete-foundationrebar-installation
parked vehicle
1m
rebar formwork
rebar-installationformwork-assembly
rebar
2m
concrete work
foundation-constructionrebar-placement
utility-vehicle
2m
site grading
site-gradingtank-foundation-prep
excavator
2m
site grading
foundation-preparationgravel-spreading
excavator
2m
pipeline installation
pipe-installationwall-penetration
gravel
2m
valve vault
concrete-applicationvalve-vault-installation
shovel
2m
concrete work
foundation-installationconcrete-foundation
red machinery
2m
trenching
trenchingwarning-tape-laying
backhoe