No caption
IMG_7093.JPG
Details
Thursday, April 10, 2025 · 10:15 AM
39.39135, -120.02120· 1683m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/830sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7389
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:04:10
GPSDestBearing25.6307
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection25.6307
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:15:3
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-04-10T10:15:04.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.6968
Software18.4
SubjectArea{"0":2003,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized285
SubSecTimeOriginal285
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Several workers in hi-vis vests and hard hats are installing rebar for a circular tank foundation in a wooded area. The wooden formwork is radial and encompasses a reinforced steel grid. The terrain is uneven with visible trees and a hilly background. No heavy machinery or vehicles are visible.
rebar-formwork
uneven ground with soil sunny with clear sky open area with tree line
PPE such as hard hats and hi-vis vests are visible, but no other safety controls are evident.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
foundation-preparationgravel-spreading
excavator
0m
site grading
site-gradingtank-foundation-prep
excavator
1m
concrete work
concrete-foundationrebar-installation
parked vehicle
1m
rebar formwork
formwork-constructionwooden-formwork
wood
1m
pipeline installation
pipeline-installationtrenching
gravel
1m
concrete work
foundation-installationconcrete-foundation
red machinery
1m
concrete work
formwork-constructionfoundation-preparation
wood
2m
pipeline installation
pipe-installationwall-penetration
gravel
2m
swppp erosion control
erosion-controlsite-preparation
gravel
2m
rebar formwork
rebar-installationrebar
rebar