No caption
IMG_6806.JPG
Details
Monday, March 24, 2025 · 3:30 PM
39.39147, -120.02109· 1676m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1534sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.0785
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:24
GPSDestBearing235.2138
GPSDestBearingRefTrue North
GPSHPositioningError3.1556
GPSImgDirection235.2138
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:30:50
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-03-24T15:30:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.5828
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized089
SubSecTimeOriginal089
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a circular area with wooden formwork in a preparation stage for a tank foundation. Numerous wooden supports and braces are evenly spaced around the formwork perimeter. Heavy equipment, such as an excavator, is stationed nearby. The site is located in a mountainous area with clear weather conditions.
concrete-work
excavated soil with gravel base clear weather, bright sunlight open site with space for equipment and formwork placement
Safety features are not prominently visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
rebar formwork
rebar-installationformwork-preparation
rebar
1m
concrete work
foundation-preparationearth-moving
excavator
1m
mechanical installation
pipe-connectionvalve-inspection
concrete
3m
rebar formwork
formwork-assemblyfoundation-preparation
excavator
3m
concrete work
concrete-pouringformwork-setup
cement-mixer-truck
3m
rebar formwork
rebar-installationformwork-assembly
bulldozer
3m
rebar formwork
formwork-constructiontank-foundation
excavator
3m
mechanical installation
tank-installationmechanical-securement
utility-truck
3m
excavation
excavationfoundation-excavation
excavator
3m
excavation
excavationfoundation-prep
excavator