No caption
IMG_6758.JPG
Details
39.39101, -120.02128· 1678m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Show all EXIF (43 fields)
AI Analysis
The image shows an area where site grading appears to be taking place near the Tank foundation parking pad. Gravel has been spread across the surface in the middle, with exposed soil on the sides. Erosion control measures, such as silt fencing and straw wattles, are installed alongside an embankment. No construction equipment or vehicles are visible in the image.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
other
4m
mechanical installation
6m
site grading
6m
site grading
6m
mechanical installation
7m
swppp erosion control
7m
mechanical installation
8m
mechanical installation
9m
site grading
9m
rebar formwork