No caption
IMG_8231.JPG
Tags
Details
Thursday, June 5, 2025 · 10:43 AM
39.39102, -120.02136· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1339sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.6219
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:06:05
GPSDestBearing39.9333
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection39.9333
GPSImgDirectionRefT
GPSSpeed0.9038
GPSSpeedRefK
GPSTimeStamp17:43:19
HostComputeriPhone 16 Pro
latitude39.3910
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0214
MeteringModePattern
ModifyDate2025-06-05T10:43:21.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3866
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized129
SubSecTimeOriginal129
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a slope covered with wood chips, part of erosion control measures. A large crane is lifting a tank or silo in the background. Several vehicles and stacked materials are near the crane. The area is surrounded by trees, and there is a clear sky.
swppp-erosion-control
gravel and wood chips on slope clear sky with bright daylight vehicles and materials staged near crane
Safety features such as fence barrier are visible. Suspended load poses a potential hazard.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
3m
site grading
site-gradingearth-moving
excavator
4m
mechanical installation
crane-liftingtank-placement
crane
5m
site grading
soil-compactionearth-moving
compactor
5m
site grading
site-gradingsoil-compaction
soil-compactor
6m
mechanical installation
crane-operationlifting
crane
6m
rebar formwork
rebar-assemblyformwork-construction
wheelbarrow
6m
site grading
site-gradingwood-planks
wood-planks
7m
other
tank-constructioncoating-application
generator
7m
swppp erosion control
swppp-material-stagingerosion-control-prep
straw-wattles
7m
site grading
site-gradingaccess-road-construction
compactor