Apple iPhone 16 Pro
iPhone 16 Pro back dual wide camera 2.22mm f/2.2
2.220000028611935mmf/2.21/293sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (39 fields)
ApertureValue2.2750
BrightnessValue7.1748
ColorSpace1
CompositeImageGeneral Composite Image
ExifImageHeight2268
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:03
GPSDOP2.6972
GPSImgDirection86.1245
GPSImgDirectionRefT
GPSTimeStamp16:42:28
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 6.7650, 1.7800, 2.2000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-03-03T16:42:28.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.1939
Software18.4
SubjectArea{"0":2015,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized401
SubSecTimeOriginal401
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An excavator is seen in the middle of a cleared area surrounded by trees and mountains. The ground appears disturbed, indicating recent excavation work. The environment shows a mix of cleared vegetation and remaining shrubs. The weather looks clear with partial cloud cover, and the site is located in a mountainous and sparsely vegetated area.
excavation
disturbed soil and vegetation partly cloudy open access, no visible congestion
No safety features are visibly prominent in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
site-gradingland-clearing
excavator
1m
site grading
excavationsite-clearing
excavator
1m
trenching
trenchingpiping
gas canister
1m
site grading
site-gradingwooden-braces
soil
1m
pipeline installation
conduit-installationtrenching
construction vehicle
1m
trenching
trenchingexcavation
2m
swppp erosion control
erosion-controlswppp-installation
straw wattles
2m
electrical
conduit-installationtrenching
conduit-pipes
2m
trenching
trenchingvault-installation
construction machinery
2m
excavation
soil-disturbancehillside-excavation