No caption
IMG_0918.JPG
Details
Tuesday, October 14, 2025 · 12:14 PM
39.39151, -120.02134· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1085sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.0537
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:10:14
GPSDestBearing136.3376
GPSDestBearingRefTrue North
GPSHPositioningError13.9999
GPSImgDirection136.3376
GPSImgDirectionRefT
GPSSpeed0.3025
GPSSpeedRefK
GPSTimeStamp19:14:13
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-14T12:14:13.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.0829
Software26.0.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized642
SubSecTimeOriginal642
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench leading to a concrete vault near a large tank with visible piping. A level and shovels are visible, indicating ongoing trenching or preparation work. Construction machinery is parked adjacent to the trench. The ground surface is primarily composed of dirt and gravel.
trenching
dirt and gravel with open trench overcast lighting conditions equipment parked nearby, open trench limits access
No visible safety features in frame
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingexcavation
1m
pipeline installation
conduit-installationtrenching
construction vehicle
1m
swppp erosion control
erosion-controlswppp-installation
straw wattles
2m
trenching
trenchingexcavation
loose soil
2m
trenching
trenchingpiping
gas canister
2m
pipeline installation
pipeline-installationpipes
soil
2m
excavation
excavationsite-clearing
excavator
2m
trenching
trenchinghillside-excavation
3m
site grading
site-gradingland-clearing
excavator
3m
excavation
soil-disturbancehillside-excavation