No caption
IMG_6425.JPG
Details
Tuesday, March 4, 2025 · 3:58 PM
39.39141, -120.02093· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/135sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue6.4568
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:03:04
GPSDestBearing258.6058
GPSDestBearingRefTrue North
GPSHPositioningError8.2506
GPSImgDirection258.6058
GPSImgDirectionRefT
GPSSpeed0.0245
GPSSpeedRefK
GPSTimeStamp23:58:31
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0209
MeteringModePattern
ModifyDate2025-03-04T15:58:32.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.0794
Software18.4
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized107
SubSecTimeOriginal107
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction site where site grading is taking place. Two excavators are positioned on a newly graded area of soil surrounded by a mountain landscape. The ground is uneven with visible dirt and rocks. The machinery is actively used in the leveling or preparation of the foundation area.
site-grading
loose soil with rocks overcast skies clear site with visible access for machinery
No safety features are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
site grading
site-gradingearth-moving
excavator
6m
swppp erosion control
erosion-controlswppp-setup
gravel
6m
excavation
excavationland-clearing
excavator
6m
site grading
site-gradingearth-moving
bulldozer
6m
site grading
site-gradingground-preparation
roller
7m
rebar formwork
rebar-setupformwork-construction
rebar
8m
site grading
site-gradingerosion-control
plastic
8m
excavation
excavation-preparationsite-layout
plastic-liner
8m
swppp erosion control
site-preparationerosion-control
plastic sheeting
8m
site grading
gradingexcavation-covering
plastic-sheet