No caption
IMG_7084.JPG
Details
Wednesday, April 9, 2025 · 11:16 AM
39.39135, -120.02092· 1682m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/6711sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.2290
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:04:09
GPSDestBearing4.0934
GPSDestBearingRefTrue North
GPSHPositioningError51.6991
GPSImgDirection4.0934
GPSImgDirectionRefT
GPSSpeed3.2291
GPSSpeedRefK
GPSTimeStamp18:16:45
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0209
MeteringModePattern
ModifyDate2025-04-09T11:16:46.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.7124
Software18.4
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized115
SubSecTimeOriginal115
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays a structure of wooden formwork used for shaping a circular tank foundation. Inside the formwork, rebar is arranged, suggesting preparation for concrete pouring. The setup is located in an outdoor area with visible trees in the background. No visible workers or active equipment are present.
rebar-formwork
gravel base sunny and bright conditions unobstructed, open area with adequate space
Safety features are not visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
5m
excavation
excavation-preparationsite-layout
plastic-liner
5m
site grading
site-gradingerosion-control
plastic
5m
site grading
gradingexcavation-covering
plastic-sheet
5m
swppp erosion control
site-preparationerosion-control
plastic sheeting
5m
trenching
trenchingaccess-road-trenching
6m
site grading
road-preparationgrading
earth-moving-equipment
7m
site grading
site-gradingearth-moving
excavator
7m
site grading
site-gradingearthwork
excavator
7m
trenching
trenchingexcavation
gravel
8m
site grading
site-gradingground-preparation
roller