No caption
IMG_9533.JPG
Details
Tuesday, August 19, 2025 · 10:06 AM
39.39476, -120.02114· 1650m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/99sISO 400
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue2.9709
BrightnessValue2.2548
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0060
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat121
GPSDateStamp2025:08:19
GPSDestBearing99.4037
GPSDestBearingRefTrue North
GPSHPositioningError13.9823
GPSImgDirection99.4037
GPSImgDirectionRefT
GPSSpeed1.7247
GPSSpeedRefK
GPSTimeStamp17:6:12
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-08-19T10:06:13.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6312
Software18.6.1
SubjectArea{"0":1855,"1":1595,"2":2217,"3":1341}
SubSecTimeDigitized492
SubSecTimeOriginal492
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts an excavation site where soil has been removed to expose a buried object. The object is cylindrical, potentially indicating a pipe or conduit, partially visible below the surface. The surrounding soil is dark and rocky, with no clear safety measures visible in the frame.
excavation
rocky and dark soil daytime lighting visible not visibly congested
No visible safety features or personal protective equipment in the frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
survey layout
road-markingssite-survey
parked-vehicles
1m
trenching
trenchingexcavation
construction machinery
2m
trenching
trenchingexcavation-work
front loader
2m
site grading
site-gradingaccess-road-grading
excavator
3m
excavation
excavationtraffic-control
excavator
3m
other
pipe-installationculvert-work
soil
3m
trenching
trenchingcompaction
mini-excavator
3m
pipeline installation
pipeline-assemblypipe-fitting
hand tools
3m
other
document-reviewindoor-activity
documents
3m
trenching
trench-measurementutility-locating
excavator