No caption
IMG_8004 2.JPG
Details
Friday, May 23, 2025 · 1:08 PM
39.39471, -120.02184· 1645m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/272sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue5.5039
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:05:23
GPSDestBearing173.3965
GPSDestBearingRefTrue North
GPSHPositioningError6.3533
GPSImgDirection173.3965
GPSImgDirectionRefT
GPSSpeed0.0265
GPSSpeedRefK
GPSTimeStamp20:8:37
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0218
MeteringModePattern
ModifyDate2025-05-23T13:08:39.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.0900
Software18.5
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized175
SubSecTimeOriginal175
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a partly dug hole where utility locating appears to be happening. A green pipe is partially exposed within this excavation area, with surrounding soil and a tape measure in view. The soil looks muddy, suggesting recent digging or wet conditions.
excavation
muddy soil around an exposed pipe sunny with shadows visible open-access excavation with visible pipe
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
excavation
utility-locatingdepth-measurement
measuring-tape
1m
excavation
utility-locatingconcrete-pouring
concrete-truck
1m
survey layout
street-surveyingroad-measurement
white-SUV
2m
other
road-markingpre-construction
silver-car
2m
trenching
trench-measurementmeasuring-tape
measuring-tape
2m
excavation
utility-locatingdepth-measurement
measuring-tape
3m
excavation
pothole-utility-locatingexcavation
parked-vehicles
4m
survey layout
utility-markingsurvey-layout
truck
4m
survey layout
pavement-markingsite-preparation
pickup-truck
4m
mechanical installation
measurementflange-inspection
measuring-tape