No caption
IMG_7896.JPG
Details
Tuesday, May 20, 2025 · 1:31 PM
39.39464, -120.02105· 1658m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2445sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.7594
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:20
GPSDestBearing69.4680
GPSDestBearingRefTrue North
GPSHPositioningError6.5219
GPSImgDirection69.4680
GPSImgDirectionRefT
GPSSpeed0.0816
GPSSpeedRefK
GPSTimeStamp20:31:1
HostComputeriPhone 16 Pro
latitude39.3946
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-05-20T13:31:02.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2556
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized251
SubSecTimeOriginal251
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image depicts a construction site where a worker is using a measuring tape to gauge the depth of a trench or pothole. The ground surface consists of exposed soil and broken pavement. A worker with boots is standing next to the trench, and several construction cones are visible in the background, indicating a controlled work area.
excavation
exposed soil and pavement cut sunny day controlled access area indicated by cones
Open trench and construction cones are visible, indicating attention to safety.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
survey layout
pavement-markingutility-planning
blue suv
1m
trenching
trenchingexcavator-operation
excavator
1m
pipeline installation
pipeline-installationpvc-pipes
hand-tools
2m
trenching
trenchingpipe-exposure
utility-pipes
2m
trenching
soil-compactiontrenching
compactor
2m
pothole utility locating
pothole-utility-locatingdepth-measurement
tape-measure
3m
trenching
trenchingdepth-measurement
excavator
3m
excavation
trenchingexcavation-safety
shovel
3m
trenching
trenchingexcavation-work
excavator
3m
survey layout
survey-markingutility-alignment