No caption
IMG_0162.JPG
Details
Friday, September 12, 2025 · 3:30 PM
39.39466, -120.02106· 1664m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/377sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.4442
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:09:12
GPSDestBearing276.6790
GPSDestBearingRefTrue North
GPSHPositioningError4.7338
GPSImgDirection276.6790
GPSImgDirectionRefT
GPSSpeed0.0755
GPSSpeedRefK
GPSTimeStamp22:30:36
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-09-12T15:30:37.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.5576
Software26.0
SubjectArea{"0":191,"1":1840,"2":161,"3":160}
SubSecTimeDigitized163
SubSecTimeOriginal163
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
In the image, a worker wearing PPE is using a compactor in an open trench. Several pipes are laid across the trench, and the surrounding area shows disturbed soil. There are construction cones in the background, suggesting an active work zone. The primary activity is trenching, with soil compaction in progress.
trenching
open trench with soil daylight clear access with some equipment nearby
PPE is worn by the worker, and cones are used for area demarcation, but a trench box is not visible.
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipe-exposure
utility-pipes
1m
survey layout
pavement-markingutility-planning
blue suv
2m
trenching
utility-locatingdepth-measurement
measuring-tape
2m
excavation
excavationtrenching
excavator
2m
pipeline installation
pipeline-installationpvc-pipes
hand-tools
2m
trenching
trenchingpipe-laying
shovel
2m
excavation
utility-locatingtrench-measuring
measuring-tape
2m
trenching
trenchingdepth-measurement
excavator
2m
trenching
trenchingexcavator-operation
excavator
2m
pothole utility locating
pothole-utility-locatingdepth-measurement
tape-measure