No caption
IMG_8668.JPG
Details
Wednesday, July 9, 2025 · 9:00 AM
39.39193, -120.02164· 1664m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/303sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue7.2878
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:09
GPSDestBearing241.6520
GPSDestBearingRefTrue North
GPSHPositioningError2.4471
GPSImgDirection241.6520
GPSImgDirectionRefT
GPSSpeed0.2162
GPSSpeedRefK
GPSTimeStamp16:0:57
HostComputeriPhone 16 Pro
latitude39.3919
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-07-09T09:00:58.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.2411
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized347
SubSecTimeOriginal347
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows erosion control measures installed on a dirt slope. Erosion control blankets are laid out in a line with visible stakes securing them to the ground. Vegetation is present on the edge, and the area is sunlit with shadows present, suggesting clear weather. No heavy machinery or vehicles are visible in the frame.
swppp-erosion-control
dirt and gravel slope clear weather with sunlight and shadows open slope with no visible congestion
No specific safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
slope-excavationmachinery-operation
excavator
2m
trenching
trenchingearthwork
hand rake
2m
excavation
excavationtrenching
excavator
2m
trenching
trenchingexcavation
excavator
3m
trenching
trenchingtrench
excavator
3m
trenching
trenchingexcavation-activity
excavator
3m
swppp erosion control
erosion-controlwattle-placement
wattles
4m
pipeline installation
conduit-installationtrenching
excavator
5m
trenching
trenchingtrench
5m
trenching
trenchingsite-preparation
hand-rake