No caption
IMG_1069.JPG
Details
Wednesday, October 22, 2025 · 2:30 PM
39.39297, -120.02297· 1674m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1285sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.1110
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:10:22
GPSDestBearing236.2329
GPSDestBearingRefTrue North
GPSHPositioningError163.4363
GPSImgDirection236.2329
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:30:24
HostComputeriPhone 16 Pro
latitude39.3930
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0230
MeteringModePattern
ModifyDate2025-10-22T14:30:28.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.3279
Software26.0.1
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized638
SubSecTimeOriginal638
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows two workers on a slope stabilizing the area by spreading wood chips. The workers are using hand tools, specifically shovels. Vegetation is present on the sides of the slope, indicating a natural environment surrounding the work area. The weather appears overcast, which might affect work conditions.
swppp-erosion-control
soil and wood chips overcast weather slope accessible to workers with hand tools
Hi-vis vests are visible, but no other safety features or hazards are prominently displayed.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
6m
swppp erosion control
erosion-controlgrading
backhoe-loader
8m
swppp erosion control
pipe-cuttingpipe-handling
excavator
10m
pipeline installation
pipeline-installationtrenching
flanged pipes
13m
trenching
trenchingpipe-laying
shovel
15m
excavation
excavationrocks
excavator
16m
site grading
road-gradingsoil-compaction
soil compactor
16m
backfill
compactionhydrant-installation
trailer
17m
other
material-transportationtrailer
work-truck
18m
other
path-maintenancesurface-work
pickup-truck
19m
swppp erosion control
pipe-cuttingchain-suspension
trailer