No caption
IMG_2784.JPG
Details
Friday, January 30, 2026 · 3:03 PM
39.39302, -120.02299· 1625m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2053sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.6041
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2026:01:30
GPSDestBearing247.0612
GPSDestBearingRefTrue North
GPSHPositioningError73.7562
GPSImgDirection247.0612
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp23:3:11
HostComputeriPhone 16 Pro
latitude39.3930
LensInfo6.7650, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0230
MeteringModeSpot
ModifyDate2026-01-30T15:03:11.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.0038
Software26.2.1
SubjectArea{"0":5171,"1":2887,"2":1065,"3":1071}
SubSecTimeDigitized853
SubSecTimeOriginal853
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A construction area is visible with a backhoe loader parked centrally. A pile of rocks and a tarp-covered mound are present near the right side. Two workers are visible on the left side near trees wearing high-visibility clothing. The terrain is uneven with dirt and gravel surfaces.
swppp-erosion-control
dirt and gravel surface sunny no visible congestion or barriers
PPE such as high-visibility vests are visible; no other specific safety controls visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
swppp erosion control
pipe-cuttingpipe-handling
excavator
6m
swppp erosion control
slope-stabilizationwood-chip-application
shovel
10m
site grading
road-gradingsoil-compaction
soil compactor
12m
trenching
trenchingpipe-laying
shovel
13m
pipeline installation
pipeline-installationtrenching
flanged pipes
15m
trenching
trenchingexcavation
skid-steer-loader
15m
trenching
trenchingpipe-laying
skid-steer loader
15m
backfill
compactionhydrant-installation
trailer
15m
swppp erosion control
pipe-cuttingchain-suspension
trailer
16m
other
material-transportationtrailer
work-truck