No caption
IMG_2715.JPG
Details
Thursday, January 29, 2026 · 8:35 AM
39.39304, -120.02300· 1609m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/257sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue6.5856
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2026:01:29
GPSDestBearing289.5328
GPSDestBearingRefTrue North
GPSHPositioningError19.4650
GPSImgDirection289.5328
GPSImgDirectionRefT
GPSSpeed3.1176
GPSSpeedRefK
GPSTimeStamp16:35:37
HostComputeriPhone 16 Pro
latitude39.3930
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0230
MeteringModePattern
ModifyDate2026-01-29T08:35:39.000Z
OffsetTime-08:00
OffsetTimeDigitized-08:00
OffsetTimeOriginal-08:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.0064
Software26.2.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized054
SubSecTimeOriginal054
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows one worker operating a cutting tool on a large pipe that is suspended by a chain attached to a piece of heavy machinery. Another worker in a high-visibility vest and hard hat holds one end of the pipe while standing near a trailer. The ground is uneven dirt, suggesting a construction site.
swppp-erosion-control
dirt daytime open access with trailer in background
Workers are wearing necessary PPE, but suspended load and uneven ground present potential hazards.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
swppp erosion control
erosion-controlgrading
backhoe-loader
7m
site grading
road-gradingsoil-compaction
soil compactor
8m
swppp erosion control
slope-stabilizationwood-chip-application
shovel
13m
trenching
trenchingpipe-laying
skid-steer loader
13m
trenching
trenchingexcavation
skid-steer-loader
13m
trenching
trenchingpipe-laying
shovel
14m
swppp erosion control
pipe-cuttingchain-suspension
trailer
15m
other
material-transportationtrailer
work-truck
15m
pipeline installation
pipeline-installationtrenching
flanged pipes
17m
backfill
compactionhydrant-installation
trailer