No caption
IMG_8669.JPG
Details
Wednesday, July 9, 2025 · 9:01 AM
39.39198, -120.02159· 1663m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/498sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.0830
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:07:09
GPSDestBearing313.8657
GPSDestBearingRefTrue North
GPSHPositioningError2.5799
GPSImgDirection313.8657
GPSImgDirectionRefT
GPSSpeed0.1854
GPSSpeedRefK
GPSTimeStamp16:1:8
HostComputeriPhone 16 Pro
latitude39.3920
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-07-09T09:01:09.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.9586
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized292
SubSecTimeOriginal292
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a dirt access road with a person wearing safety gear in the midground. Silt fencing is installed along the right side of the road, likely for erosion control. The area is surrounded by trees, and the ground surface appears uneven with visible tire marks. The sky is clear, indicating good weather conditions.
swppp-erosion-control
dirt with tire marks clear sky with good lighting open access with no visible congestion
Basic PPE is visible, and silt fencing provides some erosion control.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
trenching
trenchingexcavation
excavator
2m
trenching
trenchingpipe-installation
excavator
3m
swppp erosion control
erosion-controlsilt-fence-installation
shovel
3m
trenching
trenchingexcavation-work
excavator
4m
trenching
trenchingexcavation
soil
4m
trenching
trenchingexcavation-activity
excavator
5m
site grading
gradingslope-clearing
bulldozer
5m
trenching
pipeline-trenchingpipe-installation
shovel
5m
trenching
trenchingexcavation
excavator
5m
pipeline installation
pipeline-installationtrenching
soil