No caption
IMG_0992.JPG
Details
Friday, October 17, 2025 · 12:55 PM
39.39138, -120.02110· 1681m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1795sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.3085
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:17
GPSDestBearing312.1774
GPSDestBearingRefTrue North
GPSHPositioningError8.8170
GPSImgDirection312.1774
GPSImgDirectionRefT
GPSSpeed0.5493
GPSSpeedRefK
GPSTimeStamp19:55:50
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-10-17T12:55:51.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.8100
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized859
SubSecTimeOriginal859
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Workers are installing pipelines and a valve vault within a trench on a construction site. Blue pipes are connected to a concrete valve vault, and workers are present in the trench. The area is surrounded by excavated soil and gravel, indicating active trenching work. The equipment and machinery in the background suggest ongoing site work.
valve-vault
trench with soil and gravel clear and sunny open area with access for machinery
Basic PPE is visible but no additional safety controls are in the frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
survey layout
surveyingelevation-measurement
display-screen
2m
survey layout
surveyingsite-layout
surveying-interface
3m
rebar formwork
rebar-tyingformwork-installation
rebar
4m
concrete work
concrete-pouringfoundation-work
concrete-truck
4m
site grading
gravel-spreadingfoundation-preparation
excavator
4m
other
tank-foundation-preparationcircular-structure
trucks
4m
trenching
duct-bank-installationtrenching-work
heavy machinery
5m
rebar formwork
formwork-constructionfoundation-work
trucks
5m
valve vault
excavationvalve-vault-work
excavator
5m
site grading
foundation-preparationcompacting