No caption
IMG_7684.JPG
Details
Thursday, May 8, 2025 · 2:23 PM
39.39258, -120.02223· 1637m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2611sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.0989
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:05:08
GPSDestBearing130.0586
GPSDestBearingRefTrue North
GPSHPositioningError60.8556
GPSImgDirection130.0586
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:23:54
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-05-08T14:23:56.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.3504
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized591
SubSecTimeOriginal591
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a sloped terrain with evidence of recent grading or earth movement. There are soil piles in the foreground and a cleared path extending uphill. Sparse vegetation and coniferous trees are present around the work area. No workers, equipment, or specific construction components are visible.
site-grading
graded soil path on a slope clear weather, daylight conditions open path with no visible access restrictions
Safety features and PPE are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
2m
excavation
excavationearthmoving
excavator
3m
pipeline installation
pipe-installationtrenching
toolbox
4m
trenching
trenchingexcavation
excavator
8m
pipeline installation
duct-bank-installationtrench-conduit-placement
conduits
8m
concrete work
concrete-pouringrebar
concrete-hose
12m
trenching
trenchingexcavation
soil
13m
trenching
trenchingearthwork
15m
trenching
trenchingtrench
16m
excavation
excavationearthmoving
excavators
17m
excavation
excavation-activityslope-work
excavator