No caption
IMG_0562.JPG
Details
Tuesday, September 30, 2025 · 10:58 AM
39.39260, -120.02222
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1715sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue8.6626
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:09:30
GPSDestBearing90.4680
GPSDestBearingRefTrue North
GPSHPositioningError202.3971
GPSImgDirection90.4680
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:58:36
HostComputeriPhone 16 Pro
latitude39.3926
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0222
MeteringModePattern
ModifyDate2025-09-30T10:58:40.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.7442
Software26.0
SubjectArea{"0":2011,"1":1510,"2":1107,"3":662}
SubSecTimeDigitized849
SubSecTimeOriginal849
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
Two workers in high-visibility clothing and hard hats are placing a blue pipe into a trench. The trench is surrounded by uneven, rocky soil, and a toolbox with various equipment is nearby. The blue pipe extends partially across the trench and another is being aligned for connection. The work area shows active placement and alignment of pipeline sections.
pipeline-installation
rocky soil in trench overcast or diffused daylight adequate access around trench
PPE is worn by workers; no additional safety controls are visible in frame.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
2m
excavation
excavationearthmoving
excavator
3m
trenching
trenchingexcavation
excavator
3m
site grading
site-gradingearth-moving
soil
6m
pipeline installation
duct-bank-installationtrench-conduit-placement
conduits
10m
concrete work
concrete-pouringrebar
concrete-hose
12m
trenching
trenchingexcavation
soil
13m
trenching
trenchingearthwork
14m
concrete work
concrete-pouringfoundation-construction
concrete-mixer-truck
15m
trenching
trenchingearthmoving
excavators
16m
trenching
trenchingmanual-digging
shovel