The image shows an installation of PVC conduits in an excavated trench. The conduits are being aligned and secured using a spacer bracket. A worker is wearing gloves while adjusting the conduits. The soil around the install appears compact, indicating preparation for conduit placement. This step is part of a wider duct bank installation effort.