No caption
IMG_9495.JPG
Details
Friday, August 15, 2025 · 11:34 AM
39.39475, -120.02122· 1657m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/1211sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.7261
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:15
GPSDestBearing48.5341
GPSDestBearingRefTrue North
GPSHPositioningError18.3791
GPSImgDirection48.5341
GPSImgDirectionRefT
GPSSpeed1.0060
GPSSpeedRefK
GPSTimeStamp18:34:29
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-08-15T11:34:29.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.2416
Software18.6
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized674
SubSecTimeOriginal674
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A construction worker in a high-visibility vest and hard hat is in a trench installing or assembling conduit pipes into a concrete utility box. Five gray conduit pipes are seen entering the box. An excavator is parked near the trench, while the surrounding area includes rocky soil and vegetation. Safety cones are visible near the work area.
pipeline-installation
exposed rocky soil and open trench sunny with natural daylight adequate access for workers and equipment
PPE is visible; open trench presents potential hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
excavationsite-preparation
concrete-wall
1m
excavation
pothole-measuringutility-locating
tape-measure
1m
trenching
trenchingtrench
excavator
2m
other
pothole-utility-locatingpothole
skid-steer loader
2m
trenching
trenchingconduit-installation
granular material
2m
trenching
trenchingexcavation
backhoe
2m
excavation
pothole-utility-locatingmeasuring-depth
measuring tape
2m
excavation
pothole-measurementpothole
backhoe-loader
2m
excavation
excavationtree-roots
3m
trenching
trenchingconduit-installation
track-loader