No caption
IMG_9462.JPG
Details
Thursday, August 14, 2025 · 3:57 PM
39.39437, -120.02164· 1652m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/2762sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.3015
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:08:14
GPSDestBearing282.0524
GPSDestBearingRefTrue North
GPSHPositioningError48.7710
GPSImgDirection282.0524
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:57:45
HostComputeriPhone 16 Pro
latitude39.3944
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0216
MeteringModePattern
ModifyDate2025-08-14T15:57:48.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.4317
Software18.6
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized045
SubSecTimeOriginal045
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a road with signs of maintenance or construction work, including disturbed pavement. A large piece of construction equipment is parked on the right side, and cones are set up for traffic control. A water truck is positioned further down the road. There are wooded surroundings with houses in the background.
paving-surface-restoration
disturbed pavement clear day with sunlight road is partially accessible with controlled access
Traffic cones are visible, indicating area is controlled for safety.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
pipeline installation
pipe-sealingpipe-penetration
sealant
6m
survey layout
survey-layoututility-marking
work-van
8m
excavation
excavatingtrenching
bulldozer
11m
pipeline installation
pipeline-installationtrenching
excavator
11m
trenching
trenchingpipe-installation
soil
13m
concrete work
duct-bank-installationconcrete-duct-bank
drill
14m
trenching
trenchingconduit-installation
skid-steer loader
14m
pipeline installation
trenchingpipeline-installation
shovel
14m
excavation
excavationmeter-box
rammer-compactor
15m
trenching
trenchingconduit-installation
bulldozer