No caption
IMG_0158.JPG
Details
Friday, September 12, 2025 · 3:12 PM
39.39446, -120.02166· 1667m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.2971
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:09:12
GPSDestBearing103.5718
GPSDestBearingRefTrue North
GPSHPositioningError60.7195
GPSImgDirection103.5718
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:12:41
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-09-12T15:12:44.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software26.0
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized975
SubSecTimeOriginal975
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with what appears to be a pipeline being installed. An excavator is positioned on the side of the trench. The trench walls show exposed soil and rock layers. The pipeline runs along the trench at its base. There are no visible safety barriers or PPE in the frame.
pipeline-installation
exposed soil and rock in a trench natural daylight equipment positioned at trench edge
No safety features or PPE are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
trenching
trenchingpipe-installation
soil
5m
trenching
trenchingconduit-installation
skid-steer loader
5m
excavation
excavationmeter-box
rammer-compactor
5m
trenching
trenchingutilities-laying
soil
7m
pipeline installation
trenchingpipeline-installation
shovel
7m
excavation
excavatingtrenching
bulldozer
8m
concrete work
duct-bank-installationconcrete-duct-bank
drill
8m
trenching
trench inspectiontrench work
hand tools
10m
pipeline installation
pipe-sealingpipe-penetration
sealant
10m
survey layout
survey-layoututility-marking
work-van