No caption
IMG_0825.JPG
Details
Thursday, October 9, 2025 · 2:02 PM
39.39131, -120.02133· 1678m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/2410sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.9945
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:09
GPSDestBearing319.5481
GPSDestBearingRefTrue North
GPSHPositioningError5.1490
GPSImgDirection319.5481
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:2:47
HostComputeriPhone 16 Pro
latitude39.3913
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-09T14:02:47.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.2346
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized906
SubSecTimeOriginal906
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with a duct bank installation in progress, with two concrete vaults positioned adjacent to the trench. Workers are on-site, and a tracked excavator is visible to the right. The trench is marked with caution tape, and various tools are present around the work area.
trenching
soil with gravel clear and sunny equipment and materials staged near open trench
PPE is visible but no additional safety controls are evident.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
3m
site grading
grading-worksite-clearing
bulldozer
3m
excavation
earth-movingexcavator-operation
excavator
3m
concrete work
concrete-deliverymixing
concrete mixer truck
4m
other
drainage-installationtank-setup
concrete
4m
swppp erosion control
mulch-applicationerosion-control
mulch
4m
rebar formwork
formwork-constructiontank-foundation
pipe-wrench
5m
mechanical installation
valve-installationheavy-lifting
excavator
5m
trenching
trenchingconduit-placement
conduit
5m
concrete work
formwork-constructionfoundation-preparation
shovel
5m
other
crane-operationsite-preparation
crane