No caption
IMG_9694.JPG
Details
Monday, August 25, 2025 · 11:49 AM
39.39468, -120.02168· 1661m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/708sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.9998
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:25
GPSDestBearing270.7730
GPSDestBearingRefTrue North
GPSHPositioningError25.7333
GPSImgDirection270.7730
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:49:53
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0217
MeteringModePattern
ModifyDate2025-08-25T11:49:55.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.4680
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized006
SubSecTimeOriginal006
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench along a paved area with earth excavated and piled alongside. A person wearing a high-visibility vest and work boots stands near the trench, which is marked by two safety cones. The trench runs the length of the pavement visible in the frame, and one pipe opening is visible within the trench.
trenching
exposed soil and pavement with open trench clear daylight conditions congested access due to trench
Safety cones are deployed around the trench, and PPE including a hi-vis vest and work boots are visible.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
survey layout
survey-layoutpavement
2m
excavation
pothole-measuringutility-locating
construction-truck
2m
pipeline installation
pipeline-installationtrenching
skid steer loader
2m
pothole utility locating
pothole-utility-locatingpipe
soil
3m
trenching
trenchingroad-excavation
excavator
3m
excavation
utility-locatingpotholing
excavator
3m
excavation
depth-measurementutility-locating
tape-measure
3m
excavation
utility-locatingpothole-excavation
pipe
3m
paving surface restoration
surface-assessmentalignment-marking
white SUV
4m
trenching
utility-locatingpotholing
pipe