No caption
IMG_2045.JPG
Details
39.32623, -120.20323
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
AI Analysis
Two construction workers are engaged in trench work, preparing to install or compact soil around a large corrugated black plastic pipe, likely for stormwater or drainage. A vibratory compactor is actively being used in the trench near the pipe, which is part of a retaining wall construction as seen by the rock wall structure beside it. The area is in an active stage of backfill around the newly laid pipe.
Equipment & Materials
AI Tags
Analyzed Mar 11, 2026
Nearby Photos
4m
pipeline installation
5m
excavation
5m
pipeline installation
7m
excavation
8m
excavation
9m
pipeline installation
11m
excavation
14m
site grading
15m
pipeline installation
15m
pipeline installation