No caption
IMG_2037.JPG
Details
39.32629, -120.20324
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
AI Analysis
A hole in the ground contains a partially installed corrugated plastic basin, suggesting ongoing drainage or utility infrastructure work. The excavation is cleanly dug with visible earth walls and roots, indicating preparation for further installations. A wooden board appears to be used as a temporary cover or safety measure over the opening.
Equipment & Materials
AI Tags
Analyzed Mar 11, 2026
Nearby Photos
2m
excavation
2m
excavation
7m
backfill
8m
pipeline installation
9m
excavation
11m
pipeline installation
11m
excavation
12m
pipeline installation
12m
pipeline installation
13m